Steller Systems’ Support to Joint Engineering and Maintenance Period for HMS PROTECTOR in Chile

Thursday, November 17th, 2016

Steller Systems recently provided on-site support to the Joint Engineering and Maintenance Period for HMS PROTECTOR in Talcahuano, Chile.  Our support included conducting surveys and assessments of the heating and ventilation system, survey of the draught stop installation and conducting analysis as a precursor to the installation of a Ballast Water Treatment Plant.

HMS PROTECTOR is the Royal Navy’s Ice Patrol Vessel which provides a UK sovereign presence in the British Antarctic Territory and its surrounding areas.  The ship is managed on behalf of the MOD by AW Ship Management Ltd.

 

hms-protector


Background image: © Crown Copyright 2014